EDP awarded CRC the execution of the PSFV and CS VILLACASTÍN photovoltaic plant. The PSFV Villacastín of 13.00 MW of installed power located in the municipality of Santa María del Cubillo (Ávila) and the sectioning center located in the municipality of Villacastín (Segovia). The execution of the plant will include the use of existing roads and the construction of new roads. The plant will have 26,136.00 photovoltaic modules of 505 Wp forming strings of 29 panels, photovoltaic trackers, photovoltaic inverters and transformation center connected by underground power lines. The works carried out by PERFORACIONES NOROESTE were: √ Drilling and blasting works within the limits of the park for platform regularization. √ Pre-drilling services for the installation of solar panel supports.