Concluding the Commuter Rail Network Expansion Project: Madrid – Soto del Real Joint Venture, commissioned by Adif.

Together with Contratistas Mineros, we have carried out drilling, blasting, muck-up and ground stabilisation works to adapt the railway line, ensuring the safety of the existing railway infrastructure and the surrounding environment.


In projects such as this, we demonstrate that every controlled blast is unique in terms of its calculations, charging and detonation.