Work progress on the Leon-Asturias High Speed Line. Sotiello - Campomanes section. UTE Pantalla 1 (ASCH). Slope stabilisation, social and environmental responsibility.

Perforaciones Noroeste and its integral strategy. Stabilisation of slopes using bolts, mesh and ecological shotcrete with green pigments to improve their integration into the landscape.

Slope stabilisation is a priority need in civil engineering, not only to protect infrastructures, and guarantee the safety of people.  As they are sloping surfaces vulnerable to erosion and landslides, they require interventions that ensure their stability and, at the same time, preserve the natural environment. Perforaciones Noroeste carries out this work adopting criteria of safety, sustainability and respect for the environment.

Northern Offices

Oviedo (Asturias)
Localización
Plaza Longoria Carbajal, nº 3 1º oficina 3, 33002 Oviedo
Telefono
985 20 42 09
Email
oficina@perforacionesnoroeste.es

Southern Offices

Valverde del Camino (Huelva)
Localización
Parque Industrial y Tecnológico, Nave E08, 21600 Valverde del Camino (Huelva)
Telefono
689 697 941
Email
oficina@perforacionesnoroeste.es
Proyecto financiado por el KIT DIGITAL